Building Plan Application Procedure in Haryana

Building Plan Application Procedure in Haryana

Building Plan Application Procedure in Haryana for new construction or renovation

Any person who intends to erect, re-erect or make alternation in any place in a building or demolish any building shall give notice in writing to the Competent Authority of his/ her intention in the Form BR-I, accompanied by the following documents:-

Building Plan Application Procedure in Haryana

Note: The applicant shall submit all kind of plans in electronic format on the online portal of Competent Authority. The Competent Authority shall convey objections/ observations or sanction/ refusal through online portal or prescribed mode.

 

2. Every person applying under Code 2.1 

1. Shall appoint an Architect/ Engineer for drawing up of building plans/ structural drawings and for the supervision of erection or re-erection of the building. The supervision of erection or re-erection of residential or commercial building upto 15 metres height (G+3 floors) (including stilt)may be undertaken by the Architect or the Engineer. However, in case of buildings more than 15 metres height (including stilt), the supervision shall be undertaken by both the Architect and the Engineer. During construction if appointed Architect/ Engineer notices that violation (except compoundable) are going on he shall intimate the owner and advise him to stop further construction and remove the violation, will also intimate to the concerned authority.

 

3. Submission to Competent Authority

The applicant, the Architect and Engineer shall digitally sign the application, plans, structural drawings, specifications and the certificates as required in the relevant forms and documents, before making submission to Competent Authority.

4.  In case the building application is returned

In case the building application is returned, it may be re-submitted within 60 days from the date of such return without fresh scrutiny fees. Such re-submission, however may not be allowed more than two times in 60 days from the date of first return.

 

Procedure for submitting application through self-certification

  1. [Any person intending to erect or re-erect building shall apply on Form BRSI along with documents stated in Code 2.1 to the Competent Authority for approval of building plans of buildings falling in low and moderate risk categories defined in Code 5.2(i) and 5.2(ii), under self-certification to the Competent Authority for intimation. The applicant may initiate construction immediately after submission of the application and documents.
  2. Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height) in the relevant Form BRS-II.
  3. Competent Authority or any other person authorized by him reserves the right to check the building plans and construction at any stage and violations (except compoundable ones), if found shall have to be rectified by the owner/ applicant. In case the owner/ applicant fail to rectify violations, the Competent Authority may take necessary steps to remove the violations. Action shall also be taken against the defaulting Architect by referring his case to the Council of Architecture of misconduct and debarring/ blacklisting the Architect from doing practice in State Government Departments/ Authorities. All rectifications shall be at the risk and cost of the owner and no plea of the owner shall be entertained for any default committed by the Architect engaged by him. In all such cases the procedure of self-certification shall stand aborted.
  4. If a building is erected or re-erected or construction work is commenced in contravention to any of the building regulations, the Competent Authority or any other person authorized by him shall be competent to require the building to be altered or demolished, by a written notice delivered to the owner. Such notice shall also specify the period during which such alteration or demolition has to be completed and if the notice is not complied with, the Competent Authority or any other person authorized by him may demolish the said building at the expense of the owner.

Note:-

 

 

 

 

Online receipt and endorsement.

All capabilities performed under this building regulation be performed through electronic structure. Without bias to the consensus of Code 2.3(1) over, the capabilities will incorporate all or any of the followings:-

  1. Receipt or affirmation of utilizations and installments.
  2.  Issue of endorsements, orders or headings.
  3. Investigation, enquiry or correspondence for endorsement of building plans or award of occupation testaments, and so on.
  4. Recording of archives.
  5. Issue of notification for recuperations.
  6. Upkeep of registers and records.
  7. Whatever other capability that the Able Authority might consider fit out in the open interest.

 

Arrangement of building plans by Government Divisions

The Public authority Divisions will set up the structure plans of all Administration structures adjusting to this construction regulation and will [23] issue a testament determining that the arrangements of this construction standard have been continued in all regards. Such plans will be shipped off the Skilled Power, for data and record before initiation of erection or re-erection of the structure.

 

 

Constitution of advisory groups

The Able Authority will comprise boards for;

  1. Readiness of drafting plans.
  2. Endorsement of building plans;
  3. Sythesis of infringement of building plans;
  4. Award of Occupation Authentication;
  5. Some other Advisory group with such powers and works, as may consider legitimate.

Single Joint Examination

  1. The Skillful Authority will lead single joint review by comprising a group of authorities/officials including officials/authorities of other Government Divisions (for their particular administrations) of the site/structures, any place expected, in following stages:
    (I) Pre-Development.
    (ii) During Development.
    (iii) Post Development.
  2. The Able Authority will guarantee that a similar controller will not review a similar site/working in sequential stages.
  3. The examination group will lead review of website/expanding on a day determined by the Able Expert in the request gave according to Code 2.6(1) and submit/transfer (on the web) single assessment report in no less than 48 hours to Equipped Power.
  4. The able authority might allude standard report design for single Joint Examination at Annexure-“C” or, more than likely may draft its own arrangement.

Submission of affidavit

The skillful authority at any stage for example endorsement of building plan, DPC level and award of occupation testament, if expects, case to case premise, may request a sworn statement from the candidate, according to standard configuration given at Annexure-B.

 